Orengine International

English VersionSpanish VersionItalian VersionChoose your Language:

You are here: Home :: Products :: Hydro Turbines :: General Overview

Hydro Turbines' General Overview
SMALL SCALE POWER PLANTS - Orengine employs new design techniques, synthetic materials and electronic technologies in the construction of small and mini power plants. This enables the company to offer a range of standardised machinery with the following characteristics:

  • stout structure and reduced weight;

  • minimum number of components and simplified geometry;

  • easy replacement of series components;

  • un-manned operation.

All our design reflects decades of experience, continuous research and performance monitoring of numerous units installed world-wide. Orengine total quality program guarantees our customers a complete range of mechanical and electrical equipment featuring:

  • exceptional stoutness and simplicity of constructions

  • cheap routine maintenance

  • short on-site erection time

  • great flexibility ensuring high plant efficency

  • compact, simple and extremely reliable regulation system

Orengine concept of project re-engineering is not confined to turbines. All our plant components adhere to the latest trends in terms of structural simplicity, ease of maintenance, stoutness and low cost. Limiting environmental impact is another key concern in plant design, ensuring that civil works are kept to an absolute minimum with optimal landscape integration.

TURN-KEY ENGINEERING - Site-optimised installation, assistance with civil works, a wide range of components, detailed operation and maintenance sequences - all these aspects call for optimisation to achieve the highest possible results. Close and effective collaboration with the customer’s consulting engineers and with other suppliers, as well as assistance in planning and project ensure maximum cost effectiveness by reducing the plant’s time to production to a minimum.

AGGREGATE SYSTEMS - Orengine utilizes pre-assembled aggregates which are linked up in the workshop and thoroughly tested to ensure total system operability before delivery. This approach simplifies on-site erection and drastically reduces civil works, leading to significant savings in terms of both time and cost.

© Orengine International Ltd. 2008, 2010. All Rights Reserved.